Company AdminFacility user
FORM 1 and LRIZ FORM 1 are the same screen. They describe the facility for the reporting year: how it operated, what it consumed, and what it produced. LRIZ is the local-register variant; NRIZ assigns which obligation appears.
Shared steps for create, submit, and lock: How forms work.
| Who | Facilities with a FORM 1 or LRIZ FORM 1 obligation |
| Submitted for | One facility |
| Frequency | Annual |
| Deadline | 31 March for the previous calendar year |
Why this form is sent
The Agency needs a yearly picture of the site before emission and waste figures can be interpreted: working regime, fuels, products, activity totals, and raw materials. Even a year without production still requires a report when the obligation is active.
When it applies
The form can be created when the facility is active and NRIZ has assigned FORM 1 or LRIZ FORM 1. A facility does not have both at once. One form exists per company, facility, and year.
What to fill in
- General β company, facility, year, working regime, statement of responsibility.
- Additional data β operational indicators required for that facility type.
- Fuels β fuels used during the year.
- Products β products manufactured.
- Quantity by activity β totals split by activity.
- Raw materials β main inputs.
- Note β optional explanation.
Company, facility, and year cannot be changed after the first save.
Specifics
Seasonal regimes need a start and end of the season. Empty tables are acceptable only when the facility truly had no corresponding activity β the rest of the profile must still be complete.
Related forms: air (FORM 2 / LRIZ 2 / GVE), water (FORM 3 / LRIZ 3 / OTV), soil (FORM 4 / LRIZ 4), and waste production (FORM 5 / LRIZ 5 / GIO1) for the same facility.