Company AdminFacility user
Two form groups are not annual. They follow operational dates during the year: DEO6 / GIO6 (collector day report) and DKO (hazardous-waste movement document). Each saved document is one date or one movement.
Shared steps: How forms work.
DEO6 / GIO6 β collectors and other waste owners
| Who | Waste collectors and other waste owners with this obligation |
| Submitted for | Facility + reporting date |
| Frequency | By date |
| Deadline | The reporting date itself; the date cannot be in the future. Unless NRIZ has relaxed the rule for the facility, the date is usually not older than 30 days. |
The form records waste received, handed on, and (from 2020) reused on that day. When the date is 1 January, a stock balance section appears for facilities that store waste β opening stock for the year.
Company and facility are fixed after save. A separate form is needed for each reporting date.
DKO β hazardous waste movement
| Who | Facilities with a DKO obligation (typically alongside FORM 5 / LRIZ FORM 5) |
| Submitted for | Facility + handover date of one movement |
| Frequency | By event |
| Deadline | Tied to the waste handover date on the document |
DKO is the chain-of-custody document: producer β transporter β (optional transhipment) β recipient, plus waste codes, mass, packaging, and permits.
Sections:
- General β company, facility, handover date.
- Part A β waste and transport (codes, quantity, packaging, route).
- Part B β producer / owner and handover.
- Part C β transporter.
- Part D β recipient.
- Note.
A document is first announced. It can be confirmed once the handover date is reached. After confirmation or official closure, the document cannot be edited.
Specifics
DEO6 / GIO6 and DKO often describe the same physical movement from different angles. Catalogue codes and quantities should be consistent with annual waste production (FORM 5 / LRIZ 5 / GIO1) and waste handling (GIO2βGIO5) forms for the year.